The 727 Legacy Project
Home
The Story
Build Updates
About Us
Photos
Some Instagram Shots of our Simulator
Phase One Completion
Backwall built and installed.
Building the Weather Radar.
Real Ipeco B727 Seats!
Main Instrument Panel Completed.
PFC yoke columns installed with original faceplates.
Flight engineer panel is assembled, work begins on main instrument panel.
Shell assembly is completed, work begins on cockpit lighting.
Low-Profile MDF Floor
Disassembly begins!
727-100 CPT before disassembly at Fedex Flight Training
Our visit to the FedEx Level-D 727-200 simulator
Home
The Story
Build Updates
About Us
Photos